Contact Adamson Construction : Tel: 01753 534 826
e-mail: enquiries@adamsonconstruction.co.uk

> Projects > Tottenham Hotspur

 

Adamson Construction worked as a building contractor with the manufacturers of the LED System to form concrete bases for the advertising boards which would be installed. The cables for the system need to run on a continuous loop under the bases which would then feed the units at appropriate intervals.